Restoration · Central London

Chimney inspection and repointing access

  • Central London
  • Restoration scaffolding

The job

What we built

Access for chimney inspection and repointing on a group of Victorian Gothic buildings in central London — red brick with stone dressings, steep clay-tiled roofs and tall stacks rising between the gables. Each stack has its own scaffold, with boarded working lifts wrapped around it and guardrails, toe boards and mesh brickguards to the open edges. None of the stacks could be reached from a flat roof or a drive, so each scaffold starts wherever there was ground to stand on — a courtyard, a garden, a narrow passage between two buildings, or a parapet gutter — and is carried up and over the roof to the stack.

  • Boarded working lifts wrapped around each chimney stack
  • Guardrails, toe boards and mesh brickguards to every open edge
  • Scaffolds built up from courtyards, gardens and a narrow side passage
  • Lifts stepped up past the eaves, with ladder access between them
  • Scaffold boards laid up the roof slope where the structure crosses the tiles
  • One stack reached from a parapet gutter, standards on timber boards
  • Standards padded at ground level, with hinged loading gates at the lifts

The work

Getting all the way round a chimney stack

Inspection and repointing are both done at the face of the stack, all the way round it and from where it leaves the roof up to the pots. An inspection has to see every face and every joint, not just the side that shows from the street. Repointing means raking out the old mortar and packing new mortar back in, joint by joint, and that needs somewhere steady to stand and somewhere to put the materials down — at every height the stack reaches.

A ladder against the roof gives neither. So each stack here has its own scaffold, with boarded working lifts wrapped around it on every side and guardrails, toe boards and mesh brickguards to the open edges. Whoever is working on the stack can walk round it, and anything knocked off the boards meets the brickguard rather than the roof below.

Access

Built up from the ground, a lift at a time

None of these stacks rises from a flat roof. They stand among steep clay-tiled pitches and stone-capped gables, so there is nowhere on the roof itself to start a scaffold. Each one begins on the ground instead — in a courtyard, a garden or a passage beside the building — and climbs from there.

The lifts step up the face of the building and past the eaves, then out over the roof to the stack, with ladders between them. At ground level the standards are sleeved in yellow padding where they land beside front doors and paths, and hinged loading gates close the guardrail line at the lifts when nothing is being brought up.

The roof

Crossing old tiles without breaking them

Where a chimney scaffold has to cross a roof slope, the danger is to the roof rather than to the scaffold. Old clay tiles are brittle, and a tube or a foot put down on a single tile will crack it — and a cracked tile is a leak waiting for the next wet spell.

So where the structure passes over the slope here, scaffold boards are laid up the tiles and the scaffold bears on those, spreading its weight across many tiles rather than a few. The access ladder runs up alongside, so nobody has to walk on the slope to reach the stack.

The gutter

Starting from the parapet gutter

One stack rises beside a flat parapet gutter — the walkway between the foot of a pitched roof and the parapet wall in front of it. Building up from the ground there would have meant a full-height scaffold to reach a stack that the gutter already stands halfway up to.

The scaffold starts at the gutter instead, with its standards on timber boards laid across the flat roof covering so the load is spread rather than pressed into it. The platforms are carried up from there around the stack, which in this case is banded in red and white brick.

Tight access

Up through a gap between two buildings

Another stack stands right where the building meets its taller neighbour. There is no garden or courtyard beneath it, only a narrow gap between the two walls, so the scaffold rises up through that gap — small at its foot, then opening out at the top into boarded platforms around the stack.

It is the kind of position that decides the design before anything else does. Rather than starting from a standard layout and making it fit, the scaffold is planned from where it can stand and worked up to where the work is.

Scale

Several stacks, one roofline

The photographs show several stacks across the roofline scaffolded at the same time, each with its own structure built to suit where it stands. On a group of buildings of one age and one design, stacks that have weathered side by side tend to want attention at the same time, so it often makes sense to look at all of them together rather than one at a time.

Scaffolding them together means they can be inspected and repointed as a single job, and each scaffold is designed separately for its own stack: some from the ground, some from a passage, one from a gutter.

Central London

Chimney scaffolding on period buildings in London

Stacks like these are part of the architecture rather than an afterthought — tall, banded and corbelled, standing between Gothic gables with stone dressings. That is worth keeping in mind when planning the access, because the scaffold has to reach every face of the stack without marking the stonework and brickwork around it.

The scaffolds on this job stand within the grounds — in gardens, a courtyard, a passage and a gutter — rather than on the street. Where any part of a scaffold stands on or over the public highway in London, the borough council has to license it before it goes up; we apply for the licence and build to whatever conditions come back.

There is more on working in the capital on the London scaffolding page, and on access for older buildings under restoration scaffolding. Closer to our base, chimney work is covered on the chimney scaffolding in Stevenage and chimney scaffolding in Cambridge pages.

Common questions

Chimney scaffolding in London — asked and answered

  • Do I need scaffolding to inspect or repoint a chimney?

    For a proper inspection or for repointing, yes. Both mean working at the face of the stack on every side and at every height, and repointing means raking out and replacing mortar joint by joint. A scaffold gives a boarded platform all the way round the stack with guardrails and brickguards; a ladder against the roof gives neither.

  • Does a chimney scaffold have to stand on my roof?

    Not necessarily. On this job most scaffolds were built up from the ground — courtyards, gardens and a passage — and one from a parapet gutter. Where a scaffold does have to cross a tiled slope, boards are laid up the tiles so the load is spread across many of them rather than resting on individual tiles.

  • Do I need a licence for chimney scaffolding in London?

    Only if any part of the scaffold stands on or over the public highway — the road, the footway or a verge. Then the borough council has to license it before it goes up, and we apply for it and build to the conditions attached. If the scaffold stands entirely within your own grounds, as it did here, a licence is not normally needed. We will tell you which applies at the survey.

  • Can you scaffold several chimneys at the same time?

    Yes. On this job several stacks across one roofline were scaffolded at once, each with its own structure designed for where it stands. Doing them together lets them be inspected and repointed as one job.

  • How long will the scaffold be up for chimney work?

    As long as the inspection and repairs take, plus the time to strike it. That depends on the stack and what the inspection finds, so we do not publish a standard figure — the hire period is agreed in the written price before anything goes up, and extended if the work needs longer.

  • Is the scaffold inspected while it is up?

    Yes. Scaffolds are inspected before first use, after any event that could have affected their stability, and at intervals of no more than seven days for as long as they stay up. Each scaffold is tagged with the result of the last inspection.

Chimney inspection and repointing access, Central London

Need a quote?

Talk to the people who will actually be doing the job. Tell us what the work is and roughly when you need access, and we will come and price it properly.

  • Free, no-obligation
  • Surveyed before priced
  • Written quote, hire period included

Alpine Scaffolding The team who survey, price and build it

Rather talk it through? 07736 250 242