Temporary roofs scaffolding

Temporary Roofing

  • Re-roofs
  • Loft conversions
  • Fire & flood repairs

The short version

What temporary roofs access actually involves

A weatherproof roof over the whole structure, so a re-roof, a loft conversion or fire and flood repairs can carry on whatever the forecast does.

The moment a roof comes off, the weather becomes the programme. A temporary roof puts a weatherproof cover over the whole structure so the building underneath stays dry, the trades keep working, and a wet fortnight does not become a wet fortnight of delay. Alpine builds temporary roofs for re-roofs, loft conversions and emergency repairs after fire or flood damage.

  • Re-roofs
  • Loft conversions
  • Fire & flood repairs
  • Listed roof works
Temporary Roofing by Alpine Scaffolding

Why it is done this way

What you get from Alpine

  • The programme stops depending on the forecast

    Work continues through rain and wind rather than pausing every time the weather turns, which is usually where re-roof programmes lose their weeks.

  • The building stays dry

    An open roof lets water into ceilings, plaster and floors. A temporary roof protects the fabric below while the permanent covering is off.

  • Designed for uplift

    A temporary roof is a large surface in the wind. The supporting scaffold is designed and tied for the loads that creates, not just for access.

  • Suited to emergency work

    After fire or flood damage a temporary roof secures the property quickly so drying out and repairs can begin.

In the price

What the quote covers

  • Survey of the roof structure, spans and tie positions before design
  • Fully sheeted or system roof sized to cover the working area
  • Scaffold beneath designed to carry the roof loading and wind uplift
  • Access maintained to the roof area beneath the cover
  • Inspection through the hire, including after severe weather
  • Phased dismantle as the permanent roof is completed

Anything outside this is priced and agreed before it happens — never added afterwards.

Common questions

Before you book

The questions that come up on nearly every temporary roofs job in Stevenage, Cambridge and across Hertfordshire. All FAQs

  • When do I need a temporary roof rather than just scaffolding?

    Whenever the permanent roof covering is coming off and the building below has to stay dry — re-roofs, loft conversions, listed roof works, and emergency repairs after fire or flood. Without one, a wet fortnight becomes a wet fortnight of delay and water gets into ceilings, plaster and floors.

  • How long can a temporary roof stay up?

    As long as the works need. It is inspected through the hire, including after severe weather, and the hire period is agreed in the written price with extension available if the programme runs on.

  • Are temporary roofs safe in high winds?

    A temporary roof is a large surface in the wind, so the scaffold beneath it is designed and tied for the uplift that creates rather than for access alone. It is inspected after severe weather as a matter of course.

  • Can you install a temporary roof at short notice after storm or fire damage?

    Where the diary allows, yes — securing a damaged property quickly is one of the main reasons temporary roofs get called for. Call the office and we will tell you honestly what we can do and when.

  • Do you cover temporary roofing across Hertfordshire and Cambridge?

    Yes. Temporary roofing is available anywhere in the working area, which runs from the Stevenage yard across Hertfordshire into Cambridgeshire and Bedfordshire.

  • Do I need a permit or licence?

    If the scaffold stands on or over public land — a pavement, a verge or a road — the local authority requires a licence. We apply for it, deal with the council and build to whatever conditions they attach, such as lighting, hoarding or a protected pedestrian route. If the scaffold sits entirely on private property, no licence is normally needed. We will tell you which applies at the survey.

  • How long does it take to put up?

    Most domestic scaffolds go up in a day, and many in a few hours. Larger commercial structures, temporary roofs and anything requiring a bespoke design take longer, and phased jobs are erected in sections to suit the programme. You get a date at the point of quoting, and the crew arrives on it.